Prevent cable detachment and weld-zone corrosion on X65/X70/X80 steel pipe: charge sizing (#15–#45), live-pipe cold connectors, and mastic/viscoelastic encapsulation.
Cable-to-pipe attachments are critical electrical nodes—and intentional openings in the factory pipeline coating. Follow this 4-step field quality protocol:
- Control Heat Input on High-Strength Pipe: Use pipeline-formulated copper-oxide charges—
#15 (15g)for 4–10mm² test leads and#25–#32for 16–25mm² drain/anode cables—to limit copper penetration and HAZ hardness on X65–X80 steel. On live lines where hot work is prohibited, specify JUDUN Weld-Free Cold Connectors. - Dry Surface & Pre-Heated Graphite Mold: Grind a clean 50×50 mm bright-metal window and pre-warm the graphite mold before the first shot to drive off moisture and prevent porous welds.
- Tap & Pull Verification: Remove slag and lightly tap the copper nugget with aslag hammer to confirm sound metallurgical fusion.
- Void-Free Coating Encapsulation: Mold Viscoelastic Paste around the irregular weld profile and cable exit, then seal with a Mastic Weld Cap or Heat-Shrink Repair Patch overlapping ≥ 50 mm onto sound 3PE coating.