A modular Deep-Well MMO Anode System (JUDUN JD-DWA) integrates 3 to 8 pre-packaged calcined-coke MMO canisters on a load-bearing frame with individual PVDF/HMWPE chlorine-resistant feeder cables, slotted gas-venting pipe, and IP66 weatherproof anode junction box for 15m–150m boreholes.
Side-by-Side Technical Specification & Lead-Time Comparison
| Engineering Parameter | Typical International Tender / Legacy Spec | JUDUN Direct Factory Equivalent | Factory QC / Standard Basis |
|---|---|---|---|
| Borehole Depth & Current / 适用井深与输出电流 | 15m – 150m · 10 A – 80 A DC String | 15m – 150m Custom String · 10 A – 100 A DC Rated | ✓ Sunde Deep-Groundbed Resistance Match |
| Feeder Cable Jacket / 深井主电缆护套 | PVDF / Kynar + HMWPE Dual Jacket | Fluoropolymer PVDF Primary + HMWPE Outer Jacket (600V/1000V) | ✓ Chlorine & Nascent Acid Resistant |
| Gas Venting System / 阳极井导气防气阻 | Slotted Vent Pipe | Anti-Silt Slotted PVC/UPVC/FRP Vent Pipe w/ Geotextile Sleeve | ✓ Prevents Anode Gas-Blocking |
| Individual Current Monitoring / 单支分流检测 | Multi-Channel Junction Box | Matched Shunt Anode Junction Box (0.01Ω Shunts per String) | ✓ ISO 15589-1 String Diagnostics |
| Factory Pre-Assembly / 工厂预组装与交期 | 10–16 Weeks Import | 7–12 Working Days (Pre-Tagged Lowering Sequence) | ✓ Cuts Rig Standby Time on Site |
Engineering Compliance Note: All third-party series designations are referenced strictly for functional specification cross-matching under ISO 15589-1 / AMPP standards. JUDUN supplies independently engineered equipment manufactured in Cangzhou, China under ISO 9001:2015 quality control.
Engineering Cross-Reference FAQ
Why is PVDF/HMWPE cable mandatory inside deep anode wells?
Download Editable EPC Tender Specification (.DOCX) & Typical CP Installation Drawings
Includes 4 CAD-style vector installation detail sheets (ICCP Shallow Groundbed, 15–150m Deep-Well MMO String, HV Corridor SSD + Insulating Flange Spark Gap, Test Station & IR-Free Coupon) plus a ready-to-edit Microsoft Word (.docx) Project Technical Specification.