Replacing wet potassium hydroxide (KOH) electrolytic Kirk Cells (K-5, K-25, K-50) with a dry Solid-State Decoupler (JUDUN SSD-45A) eliminates caustic electrolyte evaporation, periodic water topping, and hydrogen venting while expanding the DC blocking window to -2.0V/+2.0V.
Side-by-Side Technical Specification & Lead-Time Comparison
| Engineering Parameter | Typical International Tender / Legacy Spec | JUDUN Direct Factory Equivalent | Factory QC / Standard Basis |
|---|---|---|---|
| Electrolyte & Maintenance / 内部介质与维护 | 30% Liquid KOH · Quarterly Refill | Dry Solid-State Semiconductor + Thyristor · Zero Refill | ✓ Sealed Maintenance-Free IP66/IP68 |
| DC Blocking Window / 阴保阻直电压范围 | ~1.7 V (Electrolytic Decomposition) | -2.0 V to +2.0 V DC (<100 μA Leakage) | ✓ Avoids High-Potential Mg Anode Drain |
| Steady AC Conduction / 持续交流排流能力 | 25 A – 50 A AC | 45 A – 100 A rms Continuous AC | ✓ 50/60 Hz Low-Impedance Path |
| Hydrogen Gas Emission / 氢气析出隐患 | Vents H₂/O₂ during AC/Fault flow | Zero Gas Evolution (Hermetically Potted) | ✓ Safe for Enclosed Test Stations |
| Manufacturing Lead Time / 工厂出货周期 | 8–12 Weeks + Hazmat Electrolyte Rules | 5–7 Working Days (Non-Hazardous Air/Sea Freight) | ✓ IATA / IMDG Non-Restricted Cargo |
Engineering Compliance Note: All third-party series designations are referenced strictly for functional specification cross-matching under ISO 15589-1 / AMPP standards. JUDUN supplies independently engineered equipment manufactured in Cangzhou, China under ISO 9001:2015 quality control.
Engineering Cross-Reference FAQ
Why can wet Kirk cells ship slowly by air freight compared to solid-state decouplers?
Download Editable EPC Tender Specification (.DOCX) & Typical CP Installation Drawings
Includes 4 CAD-style vector installation detail sheets (ICCP Shallow Groundbed, 15–150m Deep-Well MMO String, HV Corridor SSD + Insulating Flange Spark Gap, Test Station & IR-Free Coupon) plus a ready-to-edit Microsoft Word (.docx) Project Technical Specification.